The Big Picture/LEGOLAND structure install overview
The Brief
The park had pinpointed two locations where additional covered space would make a real difference to the LEGOLAND visitor experience. The goal was to increase covered seating for guests while making sure the structures worked around existing attractions, visitor routes and the distinct character of each themed zone.
WH Silverbacks were involved from an early stage to help test different design ideas and turn initial concepts into workable solutions. By spending time on site, carrying out detailed surveys and developing 3D visuals, we wanted to make it easier for the LEGOLAND team to properly picture how the finished structures would look and function in day to day use.
Seeing the layouts visualised within the space was a key part of the briefing and early design process. It gave everyone confidence in the direction of travel and helped speed up decision making, while also reducing the risk of surprises later on. With a clear picture of how everything would sit, and look, on site, we were able to refine and improve the design as the project progressed making sure the finished structures not only looked the part but also worked practically.
The Challenge
Delivering permanent structures within a busy visitor attraction takes careful planning and good timing. All installation work needed to be carried out during closed periods, meaning the programme had to fit closely around the park’s operating calendar.
Before any installation could begin, there was a detailed process to work through. Site visits, technical discussions, layout planning and 3D design development all ensured the client felt confident in the proposed solution before moving forward. From a technical point of view, the project called for fully bespoke detailing.
Differences in surrounding building heights, tight installation footprints and the need to avoid issues such as water pooling all played a part in shaping the final design. Structural calculations informed ballast requirements and ground fixing solutions, while fabric finishes and colour choices had to be carefully considered to make sure each structure felt at home within its themed setting.
The Solution
WH Silverbacks designed and installed two fully bespoke permanent stretch tent canopies, each tailored to its specific location within the park.
A number of technical considerations shaped the final design, including:
- wall fixing solutions
- structural ballast requirements
- fully bespoke tent detailing
Variations in the height and layout of surrounding buildings meant fixing points and leg positions had to be carefully planned. This ensured the correct tension across the canopy and allowed for effective water run-off, helping to prevent potential issues such as water pooling; something identified early on as a key factor in the design process.
Because these structures were entirely bespoke, precise site measurements and close collaboration with the manufacturer were essential to ensure accurate fabrication and a smooth installation process. Concreted leg bases were prepared in advance to provide long-term stability, while galvanised structural elements (including legs, king poles and wall fixings) were finished in carefully selected colours to complement each themed area.
Fabric and colour selection were a key part of the design process, helping to ensure each structure felt fully integrated into its surroundings. The canopies were designed to work in harmony with LEGOLAND®’s distinctive branding and the individual character of each themed area. One structure was delivered in a warm chino tone, while the other featured a bold orange finish – both carefully chosen to sit naturally within the existing environment and create a visual result that felt intentional, well considered and true to their setting.
The result is two thoughtfully designed tensile canopies that provide dependable shelter for visitors. They help the spaces feel more inviting and practical, sitting comfortably within their surroundings and feel like a natural part of the park.
The Journey
Installation was delivered in carefully phased stages to fit around the park’s opening schedule. The groundworks and concrete filling was handled ahead of time by another team, with a 4 person WH Silverbacks team coming in to drill holes, install the ground fixings and complete the structure and canopy rigging. This was all done while working around ongoing site preparation and some less-than-ideal weather.
- Structural calculations based on the canopy and leg designs determined the specification for the concreted bases. These were installed in advance in collaboration with the groundworks team, allowing time for them to fully set before the main installation began.
- The first structure was built over two days.
- Ground fixings were drilled into the prepared bases before the bespoke legs and wall fixings were installed.
- Wet conditions meant extra care was needed to protect the surrounding area and keep the structure clean, with ground sheets and protective coverings used throughout the build.
- At one location, an existing lamppost needed to be retained. To make this work, it was carefully disconnected and shortened before being reinstated once the canopy was in place. A custom sleeve was then fitted to neatly cover the new join, helping the feature sit comfortably within the finished space.
- The second installation took place a few weeks later, after a busy half-term period. The team returned to site and completed a slightly more complex build within a tight timeframe, this time benefiting from much kinder weather.



The Outcome & Impact
The finished installations now provide welcoming, practical covered seating areas that visitors can use throughout the season. As well as offering reliable shelter, the new structures help make better use of previously open spaces, creating more comfortable places for families to relax and spend time within the park.
Colour was an important part of getting the final result right. The chino, orange and green finishes were chosen to reflect the character of each themed area and stay true to LEGOLAND®’s distinctive brand, helping the new covered spaces feel like a natural extension of their surroundings.
More broadly, the project demonstrates how well designed tensile structures can add lasting value within outdoor attractions. By combining thoughtful design, technical expertise and careful installation planning, WH Silverbacks delivered a solution that enhances the guest experience, supports dwell time and helps transform underused areas into hard-working, high-quality spaces.
Work With Us
Have a Project You’d Like to Discuss? – Get In Touch
Whether you’re planning a permanent installation or a temporary event environment, WH Silverbacks design and deliver bespoke stretch tent and structural solutions that are built to perform and built to belong.
If you have a project in mind and want to create better covered spaces, we’d love to hear what you’re planning to see how we can help.
Get in touch with our expert team today
- Tel: 01202 096957
- Email: info@whsilverbacks.co.uk